1. Knowledge Base
  2. Product Release Notes

Release Notes: February 2025

Welcome to the February 2025 release notes! Read on to learn more about new features, product enhancements, and bug fixes released in February 2025.

New Features

  • In addition to supporting images and videos in the Assistant, you can now upload any file type within the editor. This is great for sharing general documents or templates in addition to referencing photos and videos in steps.
  • You can make Assistant parameters and outputs required in non-compliant Assistants. Previously, parameters were optional, but now you can mark them as required in the Assistant Editor. When outputs are marked as required, users can no longer select the  "Mark Complete" option as they must fill in the user prompt.  
  • In a Lab's Setting page, there is a new section "Audit Log" where you can download a log of all changes that occurred to the lab.

LabOps

  • We have removed the Deployed Adapter section from the Lab Settings. Now, adapter configurations are only accessible through the Adapter tab of their LabOps view.

  • In the Gantt Chart view, jobs are now linked to their job details. You can also open that job’s Gantt Chart view directly in the job details pane.

  • Filters used in the Job Table view are now stored in the query string, so they are shared in the URL.

  • Updated error messages for when a signer in a signing group does not have TOTP set up on their account.

  • Job level events for pause and resume requests will be grouped chronologically within the action to which the requests occurred. 

Workflows 

  • We have removed the Deployment Config section in the Lab Settings section. Instead, you should use the new sign-in feature to connect your Dev Container with an Artificial instance. Details about the sign-in feature are here.

Bug Fixes

  • Artificial users will no longer appear in the Signature Group dialog.
  • Fix for an issue where modified request UI parameters were not persisting.
  • Fix for an issue where the scheduled time for scheduled jobs was incorrectly displayed
     
  • Fix for an issue where disable and configure options were displaying for a disconnected adapter.
  • Fixed a bug in the System Monitor where green checkmarks were incorrectly shown for System Health and Connection status.
  • Fixed a text wrapping issue on the adapters page.
  • Stability fixes to the executor.